- Inspection must take place with 80% of the pieces before they are packed.
- Pre-final inspection must be performed in the quality control room with the concerned person from the factory.
- Ensure the comments given in the inline inspection have been rectified.
- Pre-final inspection is carried out with following aspects: color, size, packing method, measurements, and fittings.