Skip to main content
  • Inspection must take place with 80% of the pieces before they are packed.
  • Pre-final inspection must be performed in the quality control room with the concerned person from the factory.
  • Ensure the comments given in the inline inspection have been rectified.
  • Pre-final inspection is carried out with following aspects: color, size, packing method, measurements, and fittings.
Open chat
Hello 👋
Can we help you?